Coater
Coater
Preparation before starting up:
Clean the surface of the machine table, push head and chain;
Open the main switch of the control box of the coating machine;
Oil or grease lubricate all moving parts (chain, push head, cam, side gauge);
Install the corresponding glue paint according to the process requirements;
Set the position of the push head, side gauge and side guide plate according to the size of the iron sheet;
Clean the three paint head roller, glue roller and embossing roller;
Clean the paint box, and inject the corresponding paint according to the process, check its viscosity, and its indicators should meet the process standards;
Install the main scraper and fill the scraper groove with paint;
Push on the felt to clean the aluminum tank, and the tank is filled with water;
Boot program
Press the run button to rotate and accelerate the light to let the machine run at a speed below 3000SPH sheets/hour;
the paint is pumped into the storage roll, and the pressure between the storage roll and the material roll, and between the feed roll and the feed roll is adjusted to make the pressure on both sides consistent, I .e. the thickness of the coating film consistent;
Adjust the pressure between the coating roller and the imprint roller to make both sides consistent and the thickness of the coating film consistent;
adjust the pressure between the paint and the imprint roller to make the pressure on both sides of the rubber roller consistent;
Note: All adjustments are realized by operating several handwheels on the operating surface of the coating machine.
After the pressure is adjusted, try to apply a process iron plate. If the sample is qualified, start the printing. If it does not meet the process requirements, set the pressure between the rollers again according to the above procedures until it is qualified;
After the sample is signed, adjust to the corresponding machine speed according to the process requirements, press the sync button of the drying room, hold the green light on the top of the drying room, and start the machine when the range is set;
The captain coordinates the command to turn on Feida, and the coating machine is in operation;
Turn off the Feida real pump after the last piece of iron is coated;